Regulation of work on electrical facilities includes the following steps:
The project is carried out other electrical licensed.
Approval of the draft power: service operation;
OAO "Mosenergosbyt" Technological and Environmental Surveillance RTN in Moscow.
Conducting electrical work organization with a license;
After completion of wiring, cables on the ceiling, walls, floor, and before the final termination, between representatives of the leading electrical and maintenance service representative to sign the act hidden works.
Upon completion of the electrical work and the installation of electrical equipment to measure and test the installation. Organization performing these works must have a license for their production, licensed and accredited electrical laboratory.
According to the results of tests and measurements was "Technical Report".